    Default SBR Build ?

    Doing my first AR build and want to buy a Lewis Machine & Tool MRP upper, chambered in 6.8 with a 12.5" barrel. I called LMT and they said 6 to 8 weeks for delivery.
    I was wondering if anyone went through LMT, and is the wait time accurate? I don't want to be waiting for 6 months, ya know...
    ZRT -SECTOR-7
    "If you do not stand behind our troops, feel free to stand in front of them" - Unknown
    "Incoming fire has the right of way" - Murphy's Military Laws
    "Fast is fine, accuracy is final" - Larry Vickers

  2. #2
    Join Date
    Oct 2006
    Location
    lebanon, Pennsylvania
    (Lebanon County)
    Age
    49
    Posts
    3,961
    Rep Power
    21474857

    Default Re: SBR Build ?

    the paper work for an sbr does'nt come through overnite either.
    it's only metal, we can out think it....

  3. #3
    Join Date
    May 2008
    Location
    Philadelphia, Pennsylvania
    (Philadelphia County)
    Age
    46
    Posts
    1,047
    Rep Power
    174

    Default Re: SBR Build ?

    Quote Originally Posted by brian View Post
    the paper work for an sbr does'nt come through overnite either.
    That I am aware of. I have two lowers at the engraver right now, so I know I still have a bit of a wait ahead. I just wanted to know if the wait time that LMT gives you is BS. LWRC said 14 weeks and I know a guy who has been waiting for alittle over 6 months and still has yet to get his order.
    ZRT -SECTOR-7
    "If you do not stand behind our troops, feel free to stand in front of them" - Unknown
    "Incoming fire has the right of way" - Murphy's Military Laws
    "Fast is fine, accuracy is final" - Larry Vickers

  4. #4
    Join Date
    Apr 2008
    Location
    Lehigh Valley, Pennsylvania
    (Northampton County)
    Posts
    35
    Rep Power
    0

    Default Re: SBR Build ?

    On the 10.5" 5.56 upper the lead time was 8 weeks if you wanted the complete upper and only 1 week if you wanted the stripped upper (minus the BCG and Charging handle). Turns out all of the delay was for back ordered bolt carriers! Check with them to see if it is the same case with the 12.5 in 6.8. If so just order the stripped upper and source your own BCG and charging handle.
    "Those who beat their swords into plowshares usually end up plowing for those who do not.”
    --- Benjamin Franklin

  5. #5
    Join Date
    May 2008
    Location
    Philadelphia, Pennsylvania
    (Philadelphia County)
    Age
    46
    Posts
    1,047
    Rep Power
    174

    Default Re: SBR Build ?

    THANKS FOR THE INFO..
    ZRT -SECTOR-7
    "If you do not stand behind our troops, feel free to stand in front of them" - Unknown
    "Incoming fire has the right of way" - Murphy's Military Laws
    "Fast is fine, accuracy is final" - Larry Vickers

Similar Threads

  1. Help me build an AR
    By Spectre6 in forum General
    Replies: 32
    Last Post: June 5th, 2008, 10:55 AM
  2. Hey Me Too! AR Build
    By Flash3x in forum General
    Replies: 6
    Last Post: April 5th, 2008, 07:49 PM
  3. First AR Build - Done.
    By Stack in forum General
    Replies: 15
    Last Post: March 29th, 2008, 04:40 AM
  4. First AR build .......
    By Stack in forum General
    Replies: 17
    Last Post: March 28th, 2008, 01:51 PM
  5. My AR Build, M4 vs. A2
    By sjl127 in forum General
    Replies: 7
    Last Post: February 16th, 2008, 07:41 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •